Leave Your Message
Blog Categories
    Featured Blog

    Your Wellhead Order Isn't Late Because of the Body — It's Late Because of One Seat Ring

    2026-09-16

    Ask any US wellhead manufacturer: the 6BX flanges landed, the tubing head spools are machined, the gate valve bodies are sitting on the rack. Then everything stops — waiting on a gate valve seat, a stem, or a single studded tee.
    That's the daily reality of API 6A wellhead valve assembly. The big forgings are never the bottleneck. The trim is.
    Here's how to kill that problem before it reaches your shop floor:
    - Slab gate valves and complete valve trim — 1-13/16" to 7-1/16"
    - Gate valve seats and seat ring inserts — alloy steel, with NACE MR0175-compliant options for H2S service
    - Studded tees and crosses, blind and test flanges — API 6A monogrammed, License No. 6A-2616
    - Seat plates, bonnets, stems, stud bolts and nuts — machined to your drawing
    - PSL1–PSL3, full heat-number MTR traceability, NDT Level III in-house
    - Forgings supplied to API 20C / 20B, FSL 2 and FSL 3
    - Lead times published up front: ~45 days up to 2-1/16", ~60 days at 7-1/16" — confirmed per part number in writing
    One qualified trim supplier means your assembly line never waits on parts — and your customers never hear the word "backorder."
    Send a part number or a drawing. You'll get price, lead time and a material cert plan within 24 hours.
    #API6A #WellheadValve #GateValveSeat #OilfieldEquipment #WellheadParts